A bespoke design providing all the features in the original brief
- Remove all existing surfacing, tarmac, grass and slabs.
- Complete all excavation, site preparation and adjust levels to overcome drainage issues.
- Create tarmac bike track with sleeper edging and timber rounds to form raised flower beds. Multi-stem silver birch tree planted as a feature.
- Supply and install natural sandstone paved area
- Install tegula block paving feature footpaths.
- Supply and install low level trim trail into wet pour rubber.
- Coloured wet pour rubber with graphics.
- Supply and install Cicgona Canopy
- Supply and install new path to feature tree seat.
A bespoke design providing all the features in the original brief
The project was completed on time and within budget.
The pictures show the before and after stages of the project.
All Equipment designed to challenge the children including balancing, co-ordination, timing and running activities.


We had extensive works carried out by Massey and Harris on our Early Years outdoor provision in 2009. The quality of service and standard of work was excellent and David really understood our needs, listened to our proposals and matched the end product to our vision for establishing a fantastic outdoor space for our youngest children.
I would strongly recommend Massey and Harris as a school contractor
Gary Handforth - Headteacher - Manley Primary and Infant Schools
Gary Handforth - Headteacher - Manley Primary and Infant Schools